Old Public Trust Building

131-135 Lambton Quay, Wellington

KE KELIT is proud to have been involved in the restoration of the heritage listed Old Public Trust Building.

The KE KELIT STEELFIX pipe system was used for the mechanical services and the fire protection pipework.

Contractors:

Architects: Warren & Mahoney

Main Contractor: McKee Fehl

Mechanical Consultants: COR Associates

Mechanical Services Contractor: Aquaheat

Fire Protection Contractor: BSC Fire Protection

Piping Systems:

"The beauty of the steelfix system is that you don't need to have machines on site. You don't need to cut threads on each pipe. Also, the pipe is a lot lighter so it's much less physical on the pipe fitters."

Roger Mays, BSC Fire Protection