Upgrading the central heating system.
KELOX MULTILAYER was used for the radiator piping during the seismic strengthening and refurbishment of 330 Lambton Quay.
Contractors:
Main Contractor: LT McGuinness
Mechanical Contractor: Aquaheat
KELOX MULTILAYER was used for the radiator piping during the seismic strengthening and refurbishment of 330 Lambton Quay.
Main Contractor: LT McGuinness
Mechanical Contractor: Aquaheat