330 Lambton Quay

Upgrading the central heating system.

KELOX MULTILAYER was used for the radiator piping during the seismic strengthening and refurbishment of 330 Lambton Quay.

Contractors:

Main Contractor: LT McGuinness

Mechanical Contractor: Aquaheat

Piping Systems: