CASE STUDIES

OLD PUBLIC TRUST BUILDING

"The beauty of the steelfix system is that you don't need to have machines on site. You don't need to cut threads on each pipe. Also, the pipe is a lot lighter so it's much less physical on the pipe fitters."


ROGER MAYS, BSC Fire Protection

PRODUCTS USED:

Case study public trust building new zealand
Case study Public trust building front view
Public trust building case study KE KELIT
PREV
NEXT
previous arrownext arrow
Slider

 

OLD PUBLIC TRUST BUILDING, 131-135, LAMBTON QUAY WELLINGTON

KE KELIT is proud to have been involved in the restoration of the heritage listed Old Public Trust Building.

The KE KELIT STEELFIX pipe system was used for the mechanical services and the fire protection pipework.

Architects: Warren & Mahoney
Main Contractor: McKee Fehl
Mechanical Consultants: COR Associates
Mechanical Services Contractor: Aquaheat
Fire Protection Contractor: BSC Fire Protection

MORE CASE STUDIES & TESTIMONIALS