CASE STUDIES & TESTIMONIALS
Read more about our involvement in various projects in New Zealand and what materials where used. Read about the experience people had with our service and innovative pipe systems and how this made their work a lot easier and faster.
Case Study: PwC Centre
CASE STUDIES PWC CENTRE, WELLINGTON WATERFRONT Installation: NME / JLP Construction Company: LT McGuiness Architect: Athfield Architects PRODUCTS USED: A striking feature of the five-storey PwC Centre, the latest building…
Case Study: Nelson Airport Redevelopment
CASE STUDIES NELSON AIRPORT REDEVELOPMENT Architects Studio Pacific Architecture Project Manager Aesculus Project Management Structural Engineer Dunning Thornton Civil Engineer CGW Consulting Engineers “This building was specified in copper…
New Zealand International Convention Centre Case Study
CASE STUDIES NEW ZEALAND INTERNATIONAL CONVENTION CENTRE Architects: Warren and Mahoney Support Architect: Woods Bagot Support Architect: Moller Architects Main Contractor: Fletcher Construction Company Ltd Mechanical Contractor: Axis Plumbing NZ…
Case Study: Centre 56
CASE STUDIES CENTRE 56 Developer: Kiwi Property Mechanical Engineer: Stephenson & Turner Main Contractor: L T McGuinness Mechanical Contractor: NME Mechanical “This was the first time we had used KE KELIT’S…
Case Study: Summerset retirement village
CASE STUDIES SUMMERSETRETIREMENTVILLAGE “With the scale of this project we needed a piping system that was very high quality and quick and easy to install, Ke Kelit have ticked both…
Case Study: King Edwards Barracks
CASE STUDIES KING EDWARDS BARRACKS Architect: Warren & Mahoney Main Contractor: Hawkins Construction Plumbing Contractor: Hanlon Pipes & Plumbing Hydraulic Consultant Building 1: Aurecom Hanlon Pipes & Plumbing installed KE KELIT STEELFIX…
Case Study: Solnet House
CASE STUDIES SOLNET HOUSE Mechanical services contractor: Advanced Building Services Ltd PRODUCTS USED: SOLNET HOUSE, 70 THE TERRACE WELLINGTON Advanced Building Services Ltd used the KE KELIT KELOX…
Case Study: Wellington Airport South Terminal
CASE STUDIES WELLINGTON AIRPORT SOUTH TERMINAL “The speed and ease of installation provided significant advantages during the course of the installation, no hot works permits or heavy equipment was a…
Case Study: Old Public Trust Building
CASE STUDIES OLD PUBLIC TRUST BUILDING “The beauty of the steelfix system is that you don’t need to have machines on site. You don’t need to cut threads on each pipe….
Case Study: 330 Lambton Quay
CASE STUDIES 330 LAMBTON QUAY 330 LAMBTON QUAY WELLINGTON KELOX MULTILAYER was used for the radiator piping during the seismic strengthening and refurbishment of 330 Lambton Quay. Main Contractor:…
Case Study: Boulcott Suites
CASE STUDIES BOULCOTT SUITES The KELOX MULTILAYER pipe system was used for the plumbing services for the Boulcott Suites, a 5-star apartment hotel in Central Wellington. PRODUCTS USED: BOULCOTT SUITES,…
Case Study: Bolton Hotel
CASE STUDIES BOLTON HOTEL “I am the owner and managing director of the Bolton Hotel, previous to this, I was employed for more than 35 years as a senior executive…