CASE STUDIES & TESTIMONIALS

Read more about our involvement in various projects in New Zealand and what materials where used. Read about the experience people had with our service and innovative pipe systems and how this made their work a lot easier and faster.

PWC centre Wellington waterfront case study

Case Study: PwC Centre

CASE STUDIES PWC CENTRE, WELLINGTON WATERFRONT Installation: NME / JLP Construction Company: LT McGuiness Architect: Athfield Architects PRODUCTS USED: A striking feature of the five-storey PwC Centre, the latest building…

LEARN MORE
Case study and testimonial nelson airport

Case Study: Nelson Airport Redevelopment

CASE STUDIES NELSON AIRPORT REDEVELOPMENT   Architects Studio Pacific Architecture Project Manager Aesculus Project Management Structural Engineer Dunning Thornton Civil Engineer CGW Consulting Engineers “This building was specified in copper…

LEARN MORE
New Zealand international convention centre case study

New Zealand International Convention Centre Case Study

CASE STUDIES NEW ZEALAND INTERNATIONAL CONVENTION CENTRE Architects: Warren and Mahoney Support Architect: Woods Bagot Support Architect: Moller Architects Main Contractor: Fletcher Construction Company Ltd Mechanical Contractor: Axis Plumbing NZ…

LEARN MORE
Testimonial case study king edwards barracks

Case Study: King Edwards Barracks

CASE STUDIES KING EDWARDS BARRACKS Architect: Warren & Mahoney Main Contractor: Hawkins Construction Plumbing Contractor: Hanlon Pipes & Plumbing Hydraulic Consultant Building 1: Aurecom Hanlon Pipes & Plumbing installed KE KELIT STEELFIX…

LEARN MORE
Case study Solnet house

Case Study: Solnet House

CASE STUDIES SOLNET HOUSE     Mechanical services contractor: Advanced Building Services Ltd PRODUCTS USED: SOLNET HOUSE, 70 THE TERRACE WELLINGTON Advanced Building Services Ltd used the KE KELIT KELOX…

LEARN MORE
Case study Airport south terminal

Case Study: Wellington Airport South Terminal

CASE STUDIES WELLINGTON AIRPORT SOUTH TERMINAL “The speed and ease of installation provided significant advantages during the course of the installation, no hot works permits or heavy equipment was a…

LEARN MORE
Case study Old public trust building

Case Study: Old Public Trust Building

CASE STUDIES OLD PUBLIC TRUST BUILDING “The beauty of the steelfix system is that you don’t need to have machines on site. You don’t need to cut threads on each pipe….

LEARN MORE
Case study Lambton Quay

Case Study: 330 Lambton Quay

CASE STUDIES 330 LAMBTON QUAY   330 LAMBTON QUAY WELLINGTON KELOX MULTILAYER was used for the radiator piping during the seismic strengthening and refurbishment of 330 Lambton Quay. Main Contractor:…

LEARN MORE
Case study Boulcott suites

Case Study: Boulcott Suites

CASE STUDIES BOULCOTT SUITES The KELOX MULTILAYER pipe system was used for the plumbing services for the Boulcott Suites, a 5-star apartment hotel in Central Wellington. PRODUCTS USED: BOULCOTT SUITES,…

LEARN MORE
Case study Bolton Hotel

Case Study: Bolton Hotel

CASE STUDIES BOLTON HOTEL “I am the owner and managing director of the Bolton Hotel, previous to this, I was employed for more than 35 years as a senior executive…

LEARN MORE
Case stusy Boulcott street

Case Study: 22 Boulcott Street

CASE STUDIES 22 BOULCOTT STREET “The beauty of the STEELFIX system is that you don’t need to have machines on site. You don’t need to cut threads on each pipe….

LEARN MORE
Case study custom house Quay

Case Study: 20 Custom House Quay

CASE STUDIES 20 CUSTOMHOUSE QUAY Architects: Studio Pacific Architecture Mechanical Engineer: eCubed Mechanical Contractor: Aquaheat “I am currently managing the installation of Steel press fit and Copper press fit by KE…

LEARN MORE