CASE STUDIES

BOLTON HOTEL

"I am the owner and managing director of the Bolton Hotel, previous to this, I was employed for more than 35 years as a senior executive in our family owned major commercial builder company. As such I feel I am well qualified to endorse the Ke Kelit steelFIX piping system. The Bolton Hotel was faced with a major problem which involved the replacement of our faulty main hot water riser and return line from top to bottom of our 20 level building. The Ke Kelit steelFIX piping system and fittings reduced this job to simplicity. It was a pity to lag the finished pipework, it looked so good and workmanlike when finished. I would be pleased to be contacted for further information."


WARICK ANGUS, MANAGING DIRECTOR (BOLTON HOTEL)

 

PRODUCTS USED:


STEELFIX 


 

 

BOLTON HOTEL, 12 BOLTON STREET WELLINGTON

The KE KELIT STEELFIX stainless steel pipe system was used for remedial works required on the PP-R hot water pipework in the Bolton Hotel.

The STEELFIX range was chosen due to its high level of quality assurance, resistance to high levels of chlorine, temperature, and pressure.

CodeMark certification provided peace of mind knowing the product was certified and appraised from raw material through to installation. Being an occupied building, the speed and ease of installation also offered significant advantages.

Plumbing Contractor: Plumbers Supreme Gaslink Ltd