CASE STUDIES

22 BOULCOTT STREET

"The beauty of the STEELFIX system is that you don't need to have machines on site. You don't need to cut threads on each pipe. Also, the pipe is a lot lighter so it's much less physical on the pipe fitters."


ROGER MAYS, BSC Fire Protection

 

 

Main Contractor:
McKEE FEHL CONSTRUCTORS LTD

Mechanical Consultants:
COR Associates Ltd

Mechanical Contractor:
NME Mechanical

Fire Protection Contractor:
BSC Fire Protection

PRODUCTS USED:

PREV
NEXT
previous arrownext arrow
Slider

22 BOULCOTT STREET WELLINGTON

The redevelopment of 22 Boulcott Street includes 8,400m2 of office space.
KE KELIT STEELFIX has been installed for the mechanical services and fire protection pipework system.

 

MORE CASE STUDIES & TESTIMONIALS